Our proposed Gundary Solar Farm project consists of a 400MWdc solar farm and battery energy storage system (BESS), located 13 kilometres south of Goulburn, New South Wales, within the local government area of Goulburn-Mulwaree Council.

We have submitted the Scoping Report and Social Impact Assessment (SIA) Scoping Report to the Department of Planning and Environment (DPE). These reports are prepared to inform the DPE’s preparation of the Secretary’s Environmental Assessment Requirements (SEARs) for the Project. You can view the Scoping Report via the below link.

The Scoping Report addresses preliminary findings relating to social impacts and the outcomes of early community and stakeholder engagements, biodiversity, Indigenous and non-Indigenous heritage, visual impacts, water considerations and flood risk, soil characteristics, and other hazards and risks, including bushfires.

Once we receive the SEARs for the Project from DPE, a more detailed phase of assessment will begin as part of the Environmental Impact Statement (EIS). The outcomes of these assessments, along with further community engagement, will inform the Project design and impact management and enhancement. Submission of the EIS and detailed studies is expected in Q2 2023.

We will be back in Gundary and Goulburn later in 2022 to continue gathering feedback and sharing Project information. In the interim, please feel free to contact us with any questions for more information by calling 1300 873 575, emailing Gundarysolar@lightsourcebp.com or using the feedback form below.

Scoping Report

Download Scoping Report

Frequently asked questions (FAQ)

Our Gundary Solar Farm FAQ provides useful information about the project.

Download FAQ

Community survey

Opportunities for community participation and feedback will continue throughout each stage of the planning and assessment process. We are currently undertaking a community survey and would love to receive your input on the project. You can participate in the survey by clicking the following link:

Gundary Survey

Information pack

If you would like to receive further information on the project or arrange a time to meet with the project team, please contact us via the ‘Get involved’ section below.

Download information leaflet

  • 400
    MWdc installed capacity
  • 800,000 MWh
    (Megawatts hours) supplied per year
  • 133,000
    homes powered (equivalent)
  • 640,000
    tonnes of carbon emissions saved
  • 213,000
    Cars off the road (equivalent)

Get involved

At Lightsource bp, our goal is to create solar assets that communities can be proud of, so if you’ve got an opinion or wish to provide feedback regarding the development, please don’t hesitate to let us know by calling 1300 873 575, emailing Gundarysolar@lightsourcebp.com or using the feedback form below. We’ll aim to get back to you within five working days.

 

Feedback Form

Work with us

The Gundary Solar Farm project will create around 400 full time equivalent (FTE) jobs during construction, and 2 to 4 ongoing FTE jobs during operation. If you are interested in keeping up to date with opportunities, please register your interest.

View our other Australian solar projects

We work with businesses and communities around the world to create low carbon, solar energy projects that make a difference.

See more of our solar projects