4.8MWdc powering Belfast International Airport

In 2016, Lightsource bp signed a 25-year Power Purchase Agreement (PPA) with Belfast International Airport for what was then the largest solar project to connect to a UK airport.

  • Site-Build-Timeline-Site-Selection

    Site Selection

  • Site-Build-Timeline-Design-Assessment

    Preliminary Assessment Design

  • Site-Build-Timeline-Planning

    Planning Application

  • Site-Build-Timeline-Conditions

    Discharge Of Planning Conditions

  • Site-Build-Timeline-Construction

    Construction

  • Site-Build-Timeline-Operation

    Operation

  • Decommissioning

Lightsource bp hard-wired a 4.84MWdc off-site solar farm into the Belfast International Airport private network – providing 27% of the airport’s annual electricity demand. The project was funded, installed and is now operated by Lightsource bp, with Belfast International Airport buying the clean electricity produced by the solar farm. After the first ten months of operation, Belfast International Airport announced savings of over £100,000, making a major impact on the airport’s cost base.

By hardwiring the solar farm directly into the airport, Lightsource bp has provided it with a source of renewable electricity, reduced energy costs and boosted its green credentials by saving 2,345 tonnes of carbon emission each year. At certain peak generation times, the airport has run on solar electricity alone for almost nine hours.

A PPA enables Lightsource bp to finance and develop utility-scale solar and energy storage solutions. Locating them on land near to major energy users such as factories, warehouses, data centres, transport hubs, leisure centres, chemical plants and water treatment facilities.

  • 4.8MWdc
    system size
  • 2016
    completion date
  • £4.8m
    funding from Lightsource bp
  • 27%
    annual electricity demand supplied
  • 2,354 tonnes
    carbon emissions saved per year

Information & resources

We’ve put together a collection of resources for anyone who’d like to know more about our Crookedstone Road solar project:

 

Download information leaflet

 

Coverage

 

Videos of our Crookedstone Road solar farm

Here are some project specific updates:

 

PressEye_2062016ap_002

Belfast International Airport - Solar PPA at Crookedstone Road, NI

Lightsource BP developed and connected Northern Ireland’s first ever large-scale solar farm. This pioneering renewable energy project was also the first ground based solar power station to be completed on the island of Ireland.

Get in touch

If you’d like to find out more about this project, email info@lightsourcebp.com, or fill out the form below. We aim to get back to you within five working days.